Elsebo project, Norway
2013
Scope: Commissioning and configuration services for relay protection and control.
Elsebo project, Norway
2013
Scope: Commissioning and configuration services for relay protection and control.
130/30 kV Björkhöjden, Sweden
2013
Scope: We did full configuration of all 7UT6xx, 7SJ6xx protection relays and a-eberle tap changer and Peterson coil protection devices, as well as participated in FAT and SAT.
FACTS, Canada
2013
Scope: One of our engineer did testing works of protection circuits at FACTS project
ATCO HVDC project, Germany
2013
Scope: Configuration were done by Siemens our engineer did FAT works and marked remarks about faults which he found on configuration for Siemens – 7SA6xx, 7UT6xx, 7SJ6xx, 7SSxx, 7SDxx, 7VE6xx, GE – distance and differential protections, SEL – distance and differential protections, Trench protection relays.
400 kV Ekhyddan substations , Sweden
2011
Scope: Commissioning and configuration services for Siemens relay protection and control.
FAT at ABB factory, UK
2011
Scope: Factory acceptance tests of relay protection cubicles at ABB factory.
400 kV substation between Finland and Russia, Finland
2012
Scope: Commissioning and configuration services for relay protection and control.
400/130 kV Rabacken substation, Sweden
2013
Scope:
Aedilis engineers did full configuration of all Siemens – 7SA6xx, 7UT6xx, ABB – REB670, RET670, REL670, REF615protection terminals with IEC 61850 protocol and goose messaging for Siemens protections. For ABB terminals we did configuration for units and ABB created .scd file, because we don’t have IET600 software license.
Factory acceptance tests were provided by our team in Vasteras.
Full commissioning and testing during SAT and participation on energizing substations. Primary equipment testing (circuit breakers) we out of scope. We did voltage and current transformer testing.
Gideobacka 130 kV part, Sweden
2013
Scope: We did configuration of all ABB – REB670, RET670, REL670, REF615 protection devices separately, .scd file was created by ABB. Our people did FAT and SAT.
66/20kV Sande substation
2013
Scope: Our engineer provided configurations of REB670, RET670, REL670, REF615 protection in ABB Oslo office and participated in SAT activities.