420 kV Balsfjord substation, Norway
2016
Scope: FAT of protection panels.
420 kV Balsfjord substation, Norway
2016
Scope: FAT of protection panels.
Tysseelva hydro power plants, Norway
2016
Scope: Manufacturing of control container, supply of equipment, FAT&SAT of control system.
Sørdalselva hydro power plants, Norway
2016
Scope: Manufacturing of control container, supply of equipment, FAT&SAT of control system.
110 kV Taivalkoski Ossauskoski, Finland
2016
Scope: Assembling of protection panels, FAT&SAT of protection systems.
130/22kV Lafallsmyern substation, Sweden
2015
Scope:
Aedilis engineer did a configuration works for 132kV and 22kV part protection terminals.
Our engineer has been involved in FAT at factory in Finland.
Commissioning of protection terminals on site in Sweden.
110/33kV Tolospera wind park, Finland
2015
Scope:
Design and documentation of the RTU and Telco panels.
Manufacturing of Protection, RTU, Telco panels and CT/VT junction box.
Detailed design of the RTU (ABB RTU 560) part.
Configuration of the RTU terminal in Lithuania.
Configuration of the telecommunication equipment (firewall – cisco ASA 5505).
2,8 MW Vestrebotn hydropower plants, Norway
2015
Scope:
Providing design services for new control system of the power plant.
Configuration works of the ABB RTU 560 and protection terminal REG650 in Lithuania and Norway.
Supplying industrial PC for the client.
110/20kV Kankaanpaa substation, Finland
2015
Scope: Configuration of the protection devices at the 110kV part – 5 pcs. Distance relay 7SA6112, 2 pcs. 6MD85 bay control relay, 1 pcs. 7SJ6452 multifunction protection relay.
Suomussalmi 110kV Substation, Finland
2015
Scope: Configuration and commissioning on site of the protection terminals.
20kV Kojeisto, Finland
2015
Scope: Configuration of the REF 541 protection terminals.