110 kV Taivalkoski Ossauskoski, Finland
2016
Scope: Assembling of protection panels, FAT&SAT of protection systems.
110 kV Taivalkoski Ossauskoski, Finland
2016
Scope: Assembling of protection panels, FAT&SAT of protection systems.
110/33kV Kooninkallio wind park, Finland
2015
Scope:
Design and documentation of the RTU and Telco panels.
Manufacturing of Protection, RTU, Telco panels and CT/VT junction box.
Detailed design of the RTU (ABB RTU 560) part.
Configuration of the RTU terminal in Lithuania.
Configuration of the telecommunication equipment (firewall – cisco ASA 5505).
220kV Stepnaja substation, Kazakhstan
2015
Scope:
Manufacturing of modular substations (container) with full preparation (ceiling, floor, lights, heating/cooling, cabling, emergency exits), assembling all protection, RTU, AC/DC and Scada panels and cubicles.
Configuration of the ABB and Siemens protection terminals, FAT at the Aedilis’ workshop in Lithuania.
Commissioning on site of protection and RTU terminals.
Wind farm substation Kuke 220/30kV, Finland
2015
Scope:
Design works for supplying factory drawings of combines transformer and line protection panels, communication panels. Drawings of secondary wiring – circuit diagrams and protections diagrams (220kV switchgear including SLD, 220/33kV transformer, 33kV switchgear including SLD, AC/DC panel with selectivity plan), connection diagrams (220 kV switchgear, 220/33kV transformer, 33kV switchgear, AC/DC panel), cable and signal list.
Assembling of protection, telecommunication panels and marshalling boxes.
Configuration of 220kV transformer diff protection, 220kV transformer feeder protection and 33kV line and incoming feeder protection.
FAT – 220kV cubicles
SAT – 220kV transformer bay, 33kV and AC/DC panels
Aland 110kV Tellholm substation, Finland
2014
Scope:
Manufacturing of protection cubicles.
Commissioning on site ABB RED + REF relays and syncrocheck.