Mumias and Rangala substations, Kenya
2012
With building 34km 132kV single circuit line from the Mumias to Rang’ala, with a power transfer capacity of 73MW the project also includes the construction of Rang’ala substation and extension of Mumias substation.
Scope: Configuration and commissioning of RTU in two substations.