Hydropower Plant Harjavalta, Finland
2016
Scope: Relay protection commissioning works at hydro power plant.
Hydropower Plant Harjavalta, Finland
2016
Scope: Relay protection commissioning works at hydro power plant.
Hydropower Plant Mankala, Finland
2016
Scope: Relay protection commissioning works at hydro power plant.
Silovuori 110/33 kV substation, Finland
2016
Scope: Assembling of protection panels, FAT&SAT of protection and RTU systems.
130kV Katko substation, Finland
2016
Scope: Assembling of protection panels, FAT&SAT of protection and RTU systems.
110 kV Taivalkoski Ossauskoski, Finland
2016
Scope: Assembling of protection panels, FAT&SAT of protection systems.
110/33kV Tolospera wind park, Finland
2015
Scope:
Design and documentation of the RTU and Telco panels.
Manufacturing of Protection, RTU, Telco panels and CT/VT junction box.
Detailed design of the RTU (ABB RTU 560) part.
Configuration of the RTU terminal in Lithuania.
Configuration of the telecommunication equipment (firewall – cisco ASA 5505).
110/20kV Kankaanpaa substation, Finland
2015
Scope: Configuration of the protection devices at the 110kV part – 5 pcs. Distance relay 7SA6112, 2 pcs. 6MD85 bay control relay, 1 pcs. 7SJ6452 multifunction protection relay.
Suomussalmi 110kV Substation, Finland
2015
Scope: Configuration and commissioning on site of the protection terminals.
20kV Kojeisto, Finland
2015
Scope: Configuration of the REF 541 protection terminals.
Pirttikoski 400 kV substation, Finland
2015
Scope: Commissioning and configuration of protection and control, RTU systems.